Hollow Time时间空洞
中文/EN
← Back to news

Aiko to convert PERC factory into 6 GW of ABC cell capacity

Chinese solar manufacturer Aiko says it will convert capacity at its Tianjin base into 6 GW of its proprietary all-back-contact (ABC) cell technology, citing that PERC cell efficiency has reached a bottleneck.

AI summary · generated only from source feed metadata; consult original
Source published
Published here
views6
Original source

PV Magazine

Media report · consult original reporting

Read the original ↗https://www.pv-magazine.com/2026/10/22/aiko-to-convert-perc-factory-into-6-gw-of-abc-cell-capacity/
Original headline

Aiko to convert PERC factory into 6 GW of ABC cell capacity

AI bilingual edit · consult original

Headlines are indexed or machine translated, not independent verification of scientific results. Medical news is not clinical advice. Distinguish interstellar concepts from demonstrated space technology using the original source.